Eliminate Crusher Events with GET Trakka™
A reliable solution for GET monitoring that has increased productivity and eliminated operational down time from crusher events.
Discover more →We’re proud of the results we’ve achieved for our customers in productivity, maintenance, and safety.
Browse our case studies to get inspired by what we could accomplish together.
A reliable solution for GET monitoring that has increased productivity and eliminated operational down time from crusher events.
Discover more →Titan 3330™ improved loading performance by increasing operator engagement.
Discover more →SNRG direct OEM replacement underground GET system proves superior for wear rate, productivity, and maintenance.
Discover more →Heavy-duty dump blocks increase rope life by 33%, saving approximately 300 man-hours each year.
Discover more →An industry first bucket and lip combo for EX8000 backhoe excavators.
Discover more →The SNRG™ direct OEM replacement underground edge system proves the superior GET system for price, wear rate and maintenance.
Discover more →The safe, consistent edged Wearpact™ for surface system cleans ROM pads, protecting fitters along with truck tyres.
Discover more →Wearpact™ improves bucket life, reduces down time and ultimately improves productivity.
Discover more →Wearpact™ is proven by a Western Australia customer to be the next generation GET for LHD's with superior wear rates and eliminated GET failure.
Discover more →The new boxpoints reduced truck fill time by an average of up to 7 seconds.
Discover more →Payloads increased by 10%, exceeding production targets.
Discover more →Increased excavator productivity, fill factor, and wear life.
Discover more →Hurricane dragline bucket results in 14.5% productivity increase.
Discover more →The new RA boxpoints increased wear life by 50% compared to existing GET.
Discover more →The new tooth saw an increase of over 100% in wear life to 500+ hours.
Discover more →Increased overall wear life, including 63% increased lip shroud wear life.
Discover more →A major iron ore miner eliminated 5 out of 6 confined spaces events per chute.
Discover more →The miner saved 38% in annual costs.
Discover more →Plant down time for rotary breaker reduced to 5 days per year.
Discover more →The site achieved a 27% increase in hourly production.
Discover more →Immediate productivity increase of 9% plus no lip-based maintenance down time.
Discover more →After more than 18 months digging, there have been no major repairs required on the cast lip.
Discover more →The site was able to completely remove maintenance down time.
Discover more →No maintenance down time after a year of operation in high abrasion, high impact iron ore.
Discover more →More than 7,000 operating hours with zero maintenance events or costs.
Discover more →17,364 hours with zero maintenance or down time recorded.
Discover more →Average truck payload increased by 3 tonnes while overloaded trucks decreased by 1%.
Discover more →Titan 3330 reduced machine duty factor by 15%.
Discover more →Titan 3330™ increased productivity and improved pass matching with reduced overloads.
Discover more →Operators increased average truck payload while decreasing truck overloads – maximizing productivity.
Discover more →With actionable data on rock hardness, the miner was able to optimize drilling and improve planning.
Discover more →Titan 3330 delivered a 26% increase in Instantaneous Productivity.
Discover more →A Chilean copper & iron mine saved seven bucket changeovers with Wearpact.
Discover more →GET Trakka provides the ultimate solution to detecting broken and lost GET in real-time.
Discover more →After operator training, operational productivity increased 19.5%.
Discover more →Titan 3330 delivers a 23% reduction in truck underloads.
Discover more →Hurricane dragline bucket results in 11% lift in average bucket payload.
Discover more →The first Hurricane has now exceeded a staggering 131 million Bank Cubic Meters of digging.
Discover more →The newly designed trunnion link resulted in minimal caprail and chain rail wear on the lower links.
Discover more →Error: Booking start time is missing.
Subscribe to our newsletter to get CR updates. Bonus: when you subscribe, we’ll send you our whitepaper on boosting mine site productivity.
"*" indicates required fields