Domite®/Laminite® Grizzly Cassettes Reduce Plant Downtime

The miner saved 38% in annual costs, as well as saving on shutdowns.

Background

Location
South Africa

Commodity
Iron Ore

Wear Product
Grizzly Cassettes

The Challenge

  • Maintenance costs and downtime – Grizzly Deck change out takes 6 days per year, competitor solution only lasted 16 weeks.
  • Eliminate safety JSA work.
  • Reduce maintenance on a Grizzly Cassette Deck.

The Solution

Replace competitor solution with Domite Grizzly Cassette Deck.

The Impact

  • Domite Grizzly Cassette Decks lasted 9 million tonnes.
  • Plant down time for wear plate change outs is now 2 days per annum.