Evolved Dump Blocks
CR Powered by Epiroc collaborated with a Bowen Basin customer and the leading rope supplier BBRG Australia to improve the service life of their RedbakXtra plasticated dump ropes.
Background
Location
Bowen Basin, QLD, Australia
Commodity
Coal
Digging Conditions
Overburden
Machine
Dragline
Make & Model
BE 2570
The Challenge
CR Powered by Epiroc collaborated with a Bowen Basin customer and the leading rope supplier BBRG Australia to improve the service life of their RedbakXtraplasticated dump ropes. This customer was struggling to consistently meet the dump rope targets as the plastic coating would delaminate from the surface prematurely, resulting in accelerated rope damage & wear.
The Solution
Working with BBRG, we were able to refine the dump sheave profile and surface finish to better match the plasticated product and reduce rope damage. This new sheave profile completed a campaign of over 30 million BCMs and yielded approx. 30% improvement in rope life compared to the more traditional “black” rope profile, resulting in fewer rope changes and reduced down time.
The new sheave profile has been rolled out on all new CR dump blocks and is compatible with black rope. Combined with twisted-ear updates new blocks are also seeing a substantial improvement in dump rope life, allowing customers to space scheduled dump rope changes further out.
P48TW-83 Dump Block
The Outcome
30% Increased Dump Rope Life
Reduced Down time
Market Leading Bearing Life
The Impact
- 30% Increase Dump Rope Life
- Reduced Down time
- Market Leading Bearing Life
- Flame Hardened Sheave
- Becket Ready
- Available in 48” & 60” Sheave Sizes
- Straight-Ear & Twisted Ear Options
Explore More Success Stories
Our door is always open
Get in touch to start the conversation
We thrive on building collaborative partnerships with the world’s best miners.
If that sounds like you, we’d love to talk.
Contact Us
Fill out the form to get the ball rolling.