Domite®/Laminite® Grizzly Cassettes Reduce Plant Down time
The miner saved 38% in annual costs, as well as saving on shutdowns.
Background
Location
South Africa
Commodity
Iron Ore
Wear Product
Grizzly Cassettes
Previous Wear Product
Creusabro 8000
The Challenge
The miner was experiencing high maintenance costs and downtime, spending six days per year changing out grizzly cassette decks. Their existing solution was only lasting 16 weeks. They were also hoping to eliminate safety JSA work and reduce maintenance requirements.
The Solution
The experienced field technicians representing CR Powered by Epiroc recommended replacing the existing solution with our Domite/Laminite grizzly cassettes.
Benefits of Domite/Laminite grizzly cassettes
The Results
Lasted 9 million tonnes
Reduced change outs to 2 days per year
The Impact
The Domite grizzly cassette decks lasted nine million tonnes, reducing plant downtime from wear plate change outs to two days per year. Three out of four JSA events were also eliminated.
Our door is always open
Get in touch to start the conversation
We thrive on building collaborative partnerships with the world’s best miners.
If that sounds like you, we’d love to talk.
Contact Us